AI
Arbor A.I. Municipal Tree Bid Manager
GSTS · Play Server

Inventory Pricing Tool

Price municipal tree work by inventory class

Use production rates, equipment burden, and margin targets to build a defensible first-pass bid from the tree inventory.

Inventory items1,248street trees + stumps
Estimated labor426.5 hrscrew-hour model
Target margin14%below preferred 18%
Bid total$74,860before alternates

Pricing worksheet

Rows mirror the production-rate table a bidder would review before export.

Draft estimate
Work classQtyProd. rateBase costMarginTotal
Routine prune · small0–12 in DBH3860.22 hr$13,94218%$16,452
Removal · mediumbucket truck + chipper422.40 hr$19,71018%$23,258
Stump grind allowancewatch dump/fuel exposure910.55 hr$8,12014%$9,257
Traffic control allowancearterial roads only181.00 day$6,84018%$8,071

Guide test controls

Internal controls for testing expressions, warnings, and movement.